Interior shots of Fellowship Center, 27 July 2006

Back to main Campus Improvements page

Entrance doors looking out
Entrance doors looking out
A view of highway 17 and the old driveway.
Half-round window
Half-round window
A beautiful chandelier will hang just behind this window.
Lobby tray ceiling N
Lobby tray ceiling N
Looking out from the youth director office into the lobby showing the recently-completed ceiling suspension grid and tray ceiling.
Lobby panorama
Lobby panorama
As viewed from the door to the kitchen hallway.
Ladies
Ladies
Ladies' room off the lobby; tile in place awaiting grout
Tray ceiling detail
Tray ceiling detail
The grid for the suspended ceiling was finished today.
Men
Men
Mens' room off the lobby; tile in place awaiting grout
Main room - stage
Main room - stage
The stage walls and ceiling are about to be primed. A curtain will cover the roll-up door in the center of the backstage area.
Stage left looking out
Stage left looking out
Looking into the main room from the stage; control room window above entrance; kitchen is on the right in this view. The ceiling and frame have been painted.
Kitchen vent hood
Kitchen vent hood
This large 24' vent hood gives an idea of the size of the cooking line
Steeple view
Steeple view
A bit washed out, unfortunately; this is the view from the linen closet